Title: Executive - IE & Planning (Cutting & Fabric)
Company Name: Purbani Fashion Limited - A Concern of Purbani Group
Vacancy: --
Age: At least 30 years
Job Location: Sirajganj (Belkuchi)
Salary: Negotiable
Experience:
B.Sc. in Textile Engineering/ B.Sc. in IPE from any reputed private or public university
Computer literacy and Proficiency in English.
Must be having technical knowledge and good communication skills.
Dynamic, Motivate, Energetic, Pro-Active.
Organizing & Managing ability with problem solving & analytical skills.
Responsibility, Honesty & Integrity.
Modern System adaptability & Creativity.
Design layout of equipment, materials, and workspace to point up maximum efficiency using IE method/tools.
Balance the line to ensure minimum Work - In - Process (WIP).
Grade the operator for new or existing. Responsible for analyzing the worker`s performance.
Ensure the follow-up of the cut bundle sheet in the line to ensure efficient assembly operation without any system loss.
Implement the GSD method on the production floor.
Set up every day`s standard input ratio & create sensitivity to workers about new methods systematically in respect of garment manufacturing.
Identify & eliminate bottlenecks that delay production associated schedules to meet the ultimate standards and initiate simplification in the overall production process.
Cause study against low production & collect lost time against low production and clarify standard operational break down to production people.
Train workers with easy & distinctive methods to develop a skilled workforce and initiate skill tests for ongoing operators.
Prepare monthly production & efficiency report, sewing alter-repair report, finishing the alter-return report, needle broken report.
To make daily production report with all required data & enlighten production people about updated production plans.
Maintain excellent coordination with production planning team; and generate substitute quality team & other production support team to ensure quality production & on-time shipment.
The study analyzes and evaluates the current company structure and proposes a strategy to improve overall working methods, reduce product Lead Time and implement lean manufacturing.
To perform any other task as assigned by the management from time to time.
Assisting team in structuring projects and solving problems.
Excellent working environment
Earn leave encashment
Others as per company policy