Title: IE in charge
Company Name: Milanty Apparels Ltd
Vacancy: 1
Age: 30 to 40 years
Job Location: Narayanganj (Sonargaon)
Salary: Negotiable
Experience:
Monitor line wise production report by hourly output basis
Low performance operators monitoring.
SMV calculation for costing.
Skill—matrix database makes and monitoring.
WIP control in sewing, cutting and finishing section
Study the workers efficiency and identify their strength & weakness to enhance their skills.
Ensure line balancing as per layout, time and motion study for all styles
Systematic group planning and execution of total production flow as well as balancing the production lines to ensure optimum capacity utilization.
Formulate production plan based on machine, manpower, study the m/c layout to achieve the optimum productivity.
Develop strategy to achieve the targeted productivity.
Ensure effective utilization of company resource.
Follows up time- study, capacity study, production study.
Monitor operator`s skill level.
Utilize time study and motion study and idle man, machine hours on daily basis.
Monitor monthly projection & labor cost analysis.
Monitor Set base target, semi-critical & critical operations, ensure the implementation of line and special incentive policy.
Supply chains follow up.
Follow up head count, line balancing, efficiency tracking report, time study, and production study.
Technical meeting 15 days before input date.
Monitor Set base target, semi-critical & critical operations, ensure the implementation of line and special incentive policy.
Operators skill upgrade.
Maintain Start up drive report for every style.
Weekly Supervisor Training
Weekly low performance operator meeting.
Efficiency tracking reports.
Implement lean concept
Maintain shipment schedule
Preparation for new and upcoming style.
Monitoring value stream mapping.
Follow up activity sampling.
Find out bottleneck and quality issue and attend to solve it.
Effective utilization of man, machine and materials.
Find out bottleneck and quality issue and attend to solve it.
Bulletin make and strictly maintain in sewing floor
Thread consumption maintain in floor
Remove bottleneck through motion and method study
Up-skilling the operators
Cycle time study
Method and Motion study
WIP planning
Production report making
Container planning
5-s training
Lean follow up
Planning
Reporting to Higher management
Workers motivate
Higher line balance efficiency
Involve in pp meeting
Maintain work discipline
Efficiency report making
Negotiable